The compute layer
- Racks and servers
- Software and workloads
- Workload scheduling and operation
For compute operators
ArcLoom is developing rack-ready capacity at sites with existing power. We provide the facility, power, cooling and connectivity. You bring your racks, servers and software.
Discuss your capacity needsDevelopment and validation. Capacity and delivery timing depend on site verification and commercial agreements.
01 / The division of work
02 / Workload fit
Fiber is available at or near several development sites. We assess bandwidth, latency and workload fit site by site.
Jobs that can run within agreed operating windows and tolerate a pause or restart.
Generation that can complete in the background, without an immediate response to a user.
Evaluation runs that can be scheduled around the capacity and connectivity of each site.
04 / Start a conversation
Send us the basics. We’ll discuss whether your workload fits the approach and what needs to be verified.
Email your requirementsOpens an email draft to devin@arcloominfra.com.
Your target megawatts and how demand may grow.
Rack count, density and cooling requirements.
Preferred regions and connectivity needs.
When you want to begin and your deployment schedule.
Which workloads can tolerate interruptions or load reductions.